Bathroom renovation

Full bathroom renovation in one place — from demolition and waterproofing to tiling, plumbing and painting. Find a team of vetted pros and request a quote.

Trades involved

Verified pros

About the project

Bathroom renovation is one of the most demanding home projects because four trades have to coordinate in a small space: plumber, electrician, tiler and painter. The most common problem starts when one tradesman takes the whole job and brings "his guy" for the other trades — if that one person is five days late, everything else slips, and you have no one to escalate to because the deal was made with one person.

The sequence runs like this: first demolition of old tiles and fixtures, then plumbing and electrical layout plus ventilation if needed, then waterproofing the floor and shower walls. Only after that does tile laying start, followed by ceiling painting and finally fixture installation. Each phase has to dry or set before the next, so an average bathroom takes between two and four weeks.

Through Poslici each tradesman has independent ratings and reviews, so you pick the plumber separately from the tiler. You see how many jobs they've done, how punctual they are, and how they communicate. There's no obligation to take a package — you can build your own team from people who've already proven they do good work.

Browse plumbers and tilers in your city before committing to a single quote.

Frequently asked questions

How long does a bathroom renovation typically take?
For a standard bathroom of 4 to 6 m², plan for two to four weeks. Waterproofing has to dry for 24 to 48 hours, tile adhesive for the same time, then painting. If layout changes or hidden damage is discovered, the timeline can extend by a week or more.
What does the price depend on most?
Bathroom size, choice of tiles and fixtures, and whether plumbing layout changes. Labor typically accounts for 35-45% of the total, the rest is materials. Moving the toilet or shower to another wall can add several hundred euros due to extra plumbing work.
Do I need to be home during the work?
Not strictly, but it's smart to drop in at the end of each phase. Key moments are after demolition (to see pipe condition), before tiling (to confirm layout) and during fixture installation. Leave keys or an intercom code with a clear schedule agreement.
What if a problem is discovered that wasn't visible at the start?
Most often it's failed pipes, hidden moisture or poor neighbor-side waterproofing. Ask the tradesman for photos and a cost estimate before approving extra work. A serious plumber will show you the problem and explain options, not just hand you a bigger bill at the end.
Do tradesmen buy materials, or do I?
Small consumables (adhesive, grout, silicone, pipes) are almost always purchased by the tradesman because they know exactly what's needed. Tiles, fixtures and faucets are better bought by you — you choose the model, and you avoid the markup tradesmen sometimes add. Agree this upfront to avoid misunderstandings.
Do I need to pay upfront?
A 20-30% deposit for materials is normal, especially when the tradesman is purchasing tiles. The rest goes in two or three installments tied to phases (after plumbing, after tiling, at completion). Don't pay more than half before half the work is done.